The project is located at the Radio Road CAT Headquarters and Administration Building, at 8300 Radio. Road, Naples. CAT’s existing facility is located on a 10.04-acre parcel. The existing facility contains a maintenance building, with maintenance bays, parts shop, vehicle parking, offices for operations staff, a dispatch area, and a training room. The existing structure has met its useful life and sustained damages from previous storms that have not been repaired, requiring demolition after a new facility is built. The design is for the construction of a state-of-the-art, sustainable, operations, and maintenance facility; the infrastructure to support the electrification of a small size fleet; and the construction of solar panels for utilization of minimizing power consumption. The design for the new facility shall address the needs of both operations and fleet maintenance; with space to accommodate administrative staff; bus operators; dispatchers; training room with space for bus simulator; parts and equipment storage; and electric fleet charging.
Public input is important and we encourage all interested residents, business owners and visitors to share comments. For those who are unable to attend the Public Information Meeting in-person on April 2, 2026, please send comments to rideCAT@collier.gov.